Friday, September 2, 2011

More Of WEFR's Addition...





















I am sorry to be boring everyone with the photos of WEFR's building. I assume I am since only a couple of you are watching. I was trying to keep the folks that moved away informed but I seem to only be getting to the past Mayor on a regular basis. I guess when I took a break from posting I lost most of you. We are almost caught up with the construction on this building after posting five straight days. All of these were taken on August 26, 2011. I have mentioned do not feel at this point I need to say much about the photos as you should be recognizing the areas of the building by now. These photos as well as all my other posts of the building are in a timeline with the first shot to the last shot. I was up at the beginning of the week and photographed the progress again and they will be coming soon, I hope to get back by Monday again if I am not forced to stay in the hell hole they call a firehouse I work at.

3 comments:

  1. I'm here Brad. I drive by WEFR about every other day and still like look at your site to see the pictures. Have a great Labor Day Weekend.

    ReplyDelete
  2. Pictures and descriptions are great. Keep them coming. It is so gratifying to see the new structures being built that a good many folks in Ship invisioned for years. Can't wait to see the finished products.

    Tim C.

    ReplyDelete
  3. I wouldn't miss it. I do need to get up Lurgan Ave and take some pictures for myself. If you need inside our compound give me a call, I can do that.

    ReplyDelete

No comments can be made anonymous, you need not sign in but you must sign a name or they will be deleted. This is just to seperate fact from fiction and keep it from being anything like whacker fest pa fire.

I am sorry to add the word verification but recently 88 of my post were spammed in one night. I do not have the time to correct that many post again, so this will eliminate the bullshit.