View through the watch room into past the hallway and into the gear room.
So far I am keeping my promise, this is two days in a row. All of these photos were taken on August 10, 2011. As you can see construction is moving rather quickly. These views show the doorways along the side and gives you a good idea of what the building will look like. I did not forget about the Shippensburg Emergency Services building, once I get you up to date with the WEFR addition I will bring you up to speed on there new building.
3 comments:
Brad the roof was put up on Friday. The building is now under roof. Didn't know if if you knew. It is going up fast.
Thanks Dave, I was aware they were doing it Friday after I left but I needed to get to work. I have been up many times since my last post photographs I am just posting one days photos at a time.
I also photogrpah the Viggies buidling each time I am up and hope to get to it next week.
Thanks for stopping by the blog and a bigger thanks for letting me know someone is still out there looking.
Welcome back Brad.
Pat Shoop
Post a Comment